Execution Schedule:
The land of the Jishiwu(機15) Land Environmental Improvement Project (Phase I) originally belonged to the Coast Guard Administration; after the overall resources scheduling and cooperating with overall national development, it was used as a connecting base for Taoyuan(桃園)’s urban industry, youth vitality, and cultural creation at the end of 2017, as well as one of the ecological green corridor and leisure belts of Taoyuan(桃園)-Linkou(林口) Railway, thus implementing substantive space reconditioning and improving the quality of public facilities with green space and multi-functional exhibition hall, integrating people's leisure and industrial development, improve the quality of life of urban residents, and achieving urban activation and regeneration. Phase II integrated local development needs through the Heart of Town Project to improve the landscape, revitalize public services and facilities, strengthen the urban green infrastructure, promote regional development, and enhance the quality of life of the people. Jishiwu(機15) land (4.7 hectares) is located in Taoyuan District(桃園區) of Taoyuan City(桃園市), adjacent to Taiwan Railway Linkou(林口) Line corridor (Taoyuan(桃園)-Linkou(林口) Railway) and Hutoushan(虎頭山) Park, with Sec. 3, Chenggong Rd.(成功路) in the east and Nankan River(南崁溪) to the southwest. With the Asian“Silicon Valley” plan base of "Taoyuan(桃園) Hutoushan(虎頭山) Innovation Park," it combines the science and technology industry and local resources, connects the axis belt of Taoyuan(桃園)-Linkou(林口) Railway, and creates a shared environment. During the implementation of Phase I of Jishiwu(機15) Land Environment Improvement Project, the whole function of the site was improved, and the space efficiency was enhanced through space transformation, green beautification, and reuse of the idle space in the second phase; it will be used as the scientific research and development base of Taoyuan City(桃園市) and provide activity fields for the public.